Showing posts with label kitchen. Show all posts
Showing posts with label kitchen. Show all posts

Saturday, April 11, 2009

Slow Progress - but progress

Back before I went to the CIL conference at the end of March, I ordered two counter stools (lower than bar stools @ 24") from GoodWood unfinished furniture.  They came in this week and I picked them up today.  I love being able to choose styles and finishes and, although the price was about the same as in a furniture store, I didn't have to drive all over town to look!

The backs are slats (a la craftsman) and the frames are ebony with seats in natural oak (as light as I could get them and just a tad darker than the cabinets).  They look really good with the counters and the floors - there are black flecks in the counter - and best of all they're comfortable!  We were actually able to eat at the counter - no balancing on our laps - of course the TV is behind us but you can't have everything.

VERY gradually things are coming together - have to find some more side tables - brought the old sofa table back but it's serving more as a console table now - with a nice tray for mail (if we can only remember to put it there!) and the lamp that the switch controls.  Need to bring the phone w/answering machine down from the bedroom.  I'm hoping tomorrow to get into the dining room and make it look more like a dining room and less like a junk room after a tornado came through!  (The living room has to wait until we decide what to do with the old 36" TV.) 

Friday, March 20, 2009

Before & After

Old Desk/New Pantry & Wine Cooler
Old Sink/New Sink - love the faucet!! It pulls out!  Love the deep sink too.
LOVE the microwave above the stove!

Sunday, March 8, 2009

Painting - and more painting

Painting is coming along nicely - in fact we went to BJs today and got an area rug - could have been a little bigger but this one is good and was certainly a good price!!  Don started moving furniture back into the family room - now we just have to figure out where things are going so that there's room for the new TV!

The end is in sight - or at least closer than it has been!

Friday, February 20, 2009

Update

We're using the kitchen - stove and oven are great! The dishwasher is so quiet that you barely notice it running while standing at the sink.  The fridge is great - empty for the most part but great!  The microwave is huge and has 2 shelves that will probably never be used!

We're still waiting for paint - painters are, apparently, in high demand. I'm ready to start myself but then reality sets in and I realize that waiting might be best.  There's a LOT to paint, including the ceiling - and I don't like painting ceilings!

So - furniture still in the dining room and we're still "living" in the living room.  The whole house is dusty and needs a deep clean - soon!

Sunday, February 8, 2009

Moving Back In



We're gradually moving back into the kitchen and the cats are back to eating downstairs!  It's going to take some time because we still need to get the kitchen and family room painted - so we aren't moving the furniture back quite yet.  But it's nice having a sink, fridge (inside) and stove again.  Not to mention one of my favorites - the wine fridge!  Now just have to get some more wine to put in it!

Tuesday, February 3, 2009

Final Days

Everything is almost done - just have to have the gas regulator behind the stove changed to something more "up to date" to allow the stove to be pushed back to its final position (just about an inch).  Otherwise everything is hooked up and appears to be running - we're gradually moving things back but I guess the major move will be this weekend.

The wine fridge is hooked up and working - but I've had the one bottle of wine I had - so it's time to take some $$ and buy more than one bottle to put in there!  I did put my Christmas present  on the counter top so that it's readily available!!    And we'll get the glasses put in the cabinet above soon.


It's such a different layout it's going to take some time to figure out the best way to work and cook in this kitchen - I mean almost everything is different - the appliances are in the same place (except the dishwasher) but all around them is different!  Oh well - should be fun figuring out the best places for everything.
I did pick out some paint - hope that will get done soon - and then we'll start moving furniture back into the family room and figuring out what still can be thrown out!

Friday, January 30, 2009

Wednesday, January 28, 2009

Counters

Counter tops!

I have counter tops!! And they're pretty - it's hard to determine what something's going to look like from a 3 inch square but these look good spread over all the counters!  I'm looking forward to what the backsplash is going to look like - the tiles have been here - hope they look as good with the counter as I think they will!

Pictures to follow- all the lights and electrical work still aren't done so, while not totally dark, it isn't very bright in there!  The floors are done too - and look good - unfortunately when the floors in the front of the house were put down, they went right over the sub-floor without an underlayment - they used an underlayment in the family room and kitchen so there's a difference in height - but the flooring people were creative in merging the two - unconventional but looks good and works!  Especially when the doors between the dining room and kitchen and family room and hall are closed!

There is a light at the end of the renovation tunnel - have to finalize paint colors -  I'm doing the painting!!

Thursday, January 22, 2009

It's Always Something

The floor is down and looks beautiful - just the 1/4 round to finish.  Monday someone is coming to connect the microwave over the stove (need to connect the vent and the electrical as well as hang the oven itself) and then sometime next week the countertops and backsplash get done.

AND the bathroom sink plumbing gets repaired (hopefully this weekend) because to keep the drip to a minimum we have to turn off the water to the hot water heater.  I remember asking, 25 years ago, if the plumbing in the house was copper and being told that the water supply lines were copper and the waste lines were PVC.  And they are with a couple of minor exceptions (one of which is now leaking).  The shut-off valves on the sink in the downstairs half bath are Quest pipe (UGH) and didn't leak until they started to dismantle the bathroom.  We got it stopped for a week or so but it started again today.  SIGH

Monday, January 19, 2009

Setback

The flooring people came today to start lying the new floors and uncovered our first real problem with the renovations - a water leak (older) around the french doors to the back that has rotted out some of the wood underneath the house.  Luckily the flooring contractor was able to contact a general contractor who came out and explained what needed to be done - remove the french door (fingers tightly crossed that the 25 year old vinyl siding doesn't break!!), cut back the subfloors about 1/2 way through the room from the door, sister new joists to the existing and replace about 8 feet of banding under the door - missing the water line to the outside faucet and the wiring immediately next to the door. 

It's good that the finished floor has been removed and it's only taking up the subfloor- and they'll work from inside the house rather than from the crawl space which makes the cost a bit less - but still THAT was a cost that wasn't anticipated.  Oh well - much better to find out now when it's easier to fix rather than after the hardwood is down - THAT would be expensive! 

The complete job had been going so smoothly (and it truly still is as the contractor is going to fix the floor tomorrow!!) but I have to admit I do want it to be over and I want my life back - I want a kitchen and 1/2 bath on the main floor again! 

Such a whiner - huh??!!   

Friday, January 16, 2009

YIKES - more STUFF

The flooring was just delivered - 35 boxes - to acclimate before being installed on Monday - and Sunday the appliances are coming - my question is where are they going?  There's plenty of room in the family room even with the flooring and I guess that's where they'll go.  That does mean that the flooring people will be moving stuff around but, as I remember, that's what they usually have to do.  Last time, though, they could put some of the things in the garage but that's not really an option this time (nor is the dining room which is completely full with all the kitchen stuff and almost all the furniture from the family room).  Oh well, we'll "make it work" as Rick (the designer) says.

This is gone remarkably well (despite one small setback caused by me  ).  We're getting toward the end and the part where I have to do some work.  I CAN paint and will probably do that work - and we're going to see if the paneling has anything behind it (if it does down it comes, if not it gets painted!!) and make sure the family room is painted too before we move stuff back.

I have to say what a remarkable thing the Flip has been and how much fun it's been to create movies! 

Day 10

New and Old










What a difference 10 days makes!


Tuesday, January 13, 2009

One Week and One Day

8 days from the start of demolition and I have no running water on the ground floor but there has been a lot of progress - all the flooring has been removed and new sub-floors put down.  Cabinets are all gone (and old appliances) and new drywall has been hung. 

Cabinets are supposed to be delivered tomorrow and new floors go in next week.  The appliances are supposed to come Thursday but that might be delayed (hopefully not!!)  Once the floor is down, a new cabinet will go in the powder room and the toilet will be reinstalled (I never knew how often I used that one :-) until it wasn't there). 

We've been eating well considering the only appliances I'm using are a crock pot and a microwave!  We've had soup, stew, chili and grilled outside a couple of times.  Have to remember to keep cooking even after all the appliances and running water return to the kitchen!!
It's been an interesting process so far - hopefully it will continue that way.

Friday, January 9, 2009

Day 5 - Floors

The flooring people were supposed to be here yesterday but it slipped through the cracks so they came today - carpets and vinyl have been ripped out.  The next step is new plywood and making sure the floor is level. 

The cabinets are supposed to be delivered on Wednesday and the appliances on Thursday (at least that's the latest calendar I've been given).  The floor will be put in on the 19th - and I guess will be stored in the family room before it gets installed. 

I never realized how big my dining room is - but right now it has a TON of stuff in it - including the dining room table and chairs, the family room sofa and two chairs, two rolling shelves with the microwave, crock pot and other cooking things.  Three other shelves hold some food, glasses and various odds and ends.  Hopefully when we go to put things back we'll continue the purging and get rid of even more stuff!!

PS - they were willing to leave the washer/dryer where it was (almost) until they lay the floor so we won't have to go to a laundro-mat - at least not right now!!  SIGH!!

Wednesday, January 7, 2009

Day 3

The video is dark (unfortunately I forgot to do the video before removing the last lamp in the family room) but it does show that both rooms are completely empty in preparation for carpet and vinyl removal tomorrow. (I'm hoping that the washer/dryer get put back since it's going to be a few days before the new floor goes down.)

The electrical rough-in inspection was today - it passed - another step along the way!

UPDATE:  A newer video of the same thing - but with daylight!

Tuesday, January 6, 2009

Day 1 - Tear Out

I meant to post this earlier but we were moving the HUGE entertainment center out of the family room (or I was helping with part of it - Don did most of the work) when I went out the front door to check that there was room for Don to bring the main section to the garage.  I wasn't paying enough attention and Quincy darted out the door.  And off he went.

All day he'd been in the bedroom but the noise had him freaked because he barely let me pet him when I got home.  I should have paid more attention - but these things happen.  Anyway, two and 1/2 hours later I saw him next door (yes I was walking down the street in hopes of seeing him) and he was headed home but VERY leary of coming in the door.  Finally tuna did the trick and I was able to lure him into the house, get a grip on him and get the door closed.

So - that's why the video of the tear-out was actually done on the second day and not the first - because I was a nervous wreck.  (And if you think this was over-reacting you should have been around one time when I didn't know where my kids were - they'd gone out to the movies and were late getting back - TOTAL FREAK OUT that night!!)

Anyway - here's the video of what's left in the kitchen!!

Sunday, January 4, 2009

Night before the Tear-Out

The beginning of the renovation - all the kitchen cabinets are empty and ready for tear-out.  A lot of the family room has been emptied - but the furniture will move into the dining room tomorrow (as you can see we've left some room (hopefully enough!!).  Then we move the TV into the living room and the entertainment center gets broken down and moved to various other rooms - now for the next step!!

Saturday, January 3, 2009

Aches and Pains

Wow - what a ton of junk was stored in my kitchen cupboards!  Almost all is gone now - either thrown out, donated or stacked (neatly) in the dining room waiting for a new home.  A few pots & pans remain but will be sorted out tomorrow.   

The family room has to be emptied too - the entertainment unit is almost empty (if we can get it apart it will be FANTASTIC!) and, hopefully, the sofa and chairs will fit neatly into the puzzle that the dining room is becoming.  The TV will be moved to the living room so that we can still watch without having to go to bed - and we'll actually use the living room for a change! 

Monday is the big day - 1st day of tearout - my kitchen will be a total mess (as will the family room) but hopefully it won't take more than a couple of days to tear out cabinets, 1/2 wall and patch all the drywall (and some spots on the ceiling). 

I know it will be great when it's finished but if I had the power I would blink my eyes (or go to sleep) and it would all be done tomorrow!!  Still have a couple of things to buy - SIGH!  In the meantime - Don's been great - moving refridgerators and packing - but both of our backs ache!

Monday, December 1, 2008

Appliances - OMG

Who knew (ok I guessed from shopping online and doing minor "window shopping" before going to the store today and getting the new appliances for my soon-to-be new kitchen) but OMG the cost of these things is out of sight!  Of course I say the same things about cars too - and it's probably for the same reason - I don't replace my stuff until absolutely necessary so the prices climb without my realizing it!!

  Now if we can only get the rest of the kitchen done without TOO much disruption and mess (and, yes I do believe in miracles!) and actually go through all the "stuff" that's been here for years and years!  SIGH!!